Office relocation planning: a complete business guide
A practical timeline for moving a team without losing a working day, from survey to the Monday stand-up.
Eight weeks out, appoint one internal owner and one external coordinator. Everything else follows from having a single point of contact on each side.
Six weeks out, complete the floor plan and seating chart. Crate numbering should match the seating chart, not the old room layout.
Four weeks out, confirm lift bookings, building inductions and parking permits at both ends. These are the items that quietly stall a move.
Two weeks out, brief the team: what to pack personally, what stays on the desk, and which crate is theirs.
Move weekend: label, wrap, load by zone, rebuild in reverse. Keep an asset list at the door and tick crates in as they arrive.
Monday: hold a short support window. Cable bags and chair keys are found in minutes when someone is on site.